An EV charger is usually lost on timing, not price. The homeowner has ordered a car, the dealer or the car maker has offered them an installer, and every day you take to quote brings them closer to saying yes to that offer. Ask for the delivery date on the first call and work backwards from it.
It's the smallest ticket you'll quote. Done well, it's also the job that gets you back in the house for the panels, the battery or the heat pump.

Who's buying, and what they need to hear
| Who | What set them off | What they need to hear |
|---|---|---|
| The new EV owner | A car on order or just delivered | A provisional fitting date before the car lands, confirmed once the supply is checked, and that you'll handle the paperwork |
| The two-car household | A second EV, or a partner switching | Whether the supply copes with both cars, and a charger that can share the load |
| The solar or battery owner | Wants to charge from their own panels | That the charger will work with the system they already have |
Quote it from photos, and visit only when you need to
- 01
Ask when the car arrives
And what they drive now. The date runs everything, and the car tells you what they'll expect from the charger.
Ask: When are you picking the car up?
- 02
Get photos of the consumer unit and the main fuse
Most charger jobs are quoted from photos and a few questions. Ask what else draws heavy power, like an electric shower, a heat pump or a second car. Go and look only where the supply is in doubt, and raise any upgrade now, not on install day.
- 03
Get the cable run in photos
Ask for photos of where they park, nose in or reversed, the wall the charger goes on and the route back to the board. If the run is in doubt, visit before you quote. Most install-day arguments start with a charger on the wrong wall.
- 04
Ask what tariff they're on
If they're not on an off-peak or EV tariff yet, that conversation is where the charger's running-cost case comes from, and it tells you how much they'll use the smart features.
Ask: Do you know your night rate?
- 05
Ask what else is coming
Panels, a battery or a heat pump in the next few years changes which charger you fit. Write it down: it's your next job.
Ask: Anything else planned for the house, like panels or a battery?
What they'll say, and what works

"The dealer offered me one."
Fair. Ask what's included, how long they'll wait for a slot and who comes out if it fails. Then give them your provisional date and your mobile number.

"I'll just use a three-pin plug."
Don't lecture. Work out with them how long a full charge takes on a plug against a charger, using their car's figures and their weekly mileage, and let them decide.

"Someone online is cheaper."
Ask what's in that price: the survey, the cable run, any work on the board, the paperwork. Cheap online prices tend to assume a short run and a perfect consumer unit.

"I'll wait until the car's here."
Then they'll be on a plug or a public charger while they wait for a slot. Quote it now and pencil in the week the car lands, confirmed once the supply is checked.

The number that closes it
From their own mileage and tariff, work out what a month of charging at home on the off-peak rate costs them, against what they'd pay on public chargers, or in fuel today. Write it next to your installed price as an estimate, with the assumptions in writing on the quote.
After the quote
- Send the quote the same day, with a photo of where the charger goes.
- Put a provisional fitting date in writing, tied to the car's delivery date and confirmed once the supply is checked.
- A customer who signs at home or remotely usually has a legal right to cancel, so hand over the cancellation paperwork and say so out loud.
- If you haven't heard in two days, ring. EV buyers are deciding against the calendar, not against you.
- After the install, show them the app. Once their first bill lands, ask whether they've thought about panels or a battery.
What EV charger installers ask
Do I need to visit before I quote?
Usually not. Most charger jobs are quoted from photos and a few questions; go and look only where the supply or the cable run is in doubt.
What if the supply needs upgrading?
Raise it on the first call, not on install day, and give a provisional date that is confirmed once the supply is checked.
Should I bring up solar on a charger job?
Fit the charger well first. Once their first bill lands, ask whether they have thought about panels or a battery.
How do I compete with the installer the dealer offered?
Ask what is included and how long they will wait for a slot, then give your provisional date and your mobile number. Charger jobs are usually lost on timing, not price.
Can I quote a monthly figure?
Only if you are authorised to offer credit, or through your finance provider. Otherwise give the installed price and the running cost estimate, with the assumptions in writing.





Keilan James-Devereux
Chesney Stewart